Luminance Consulting

Book a meeting
English,

Choosing equipment and design office

Lighting design office: what it brings to a project

Audit, costed scenarios, layout, acceptance measurements: what a lighting design office brings before, during and after the works.

Luminance ConsultingProfessional lighting design office

5 min read

Office ceiling fitted with a recessed LED luminaire

A lighting project is often decided on three supply quotes compared line by line. The number of luminaires, the wattage and the unit price appear in all of them. The result expected in the room, illuminance, uniformity and glare, appears in none. This is exactly where the design office comes in, on what no quote shows.

What a lighting design office actually produces

A lighting design office delivers documents, not intentions. Site surveys, calculation assumptions, simulations, layout plans, result tables, costing and scenario comparison: each stage takes the form of a verifiable document.

These documents serve three purposes: deciding internally, consulting contractors on a comparable basis, then checking at acceptance that the installation delivered matches what was approved.

Phase

Work carried out

Document delivered

Survey

Visit, measurements, inventory of the installed base, operating constraints

Condition report

Study

Room modelling, simulation, compared scenarios

Photometric study and costing

Works

Layout, on-site adjustment, decisions during installation

Updated plans

Acceptance

Joint measurements, comparison with the study

Measurement report

The value of these documents lies in their traceability. A written assumption can be challenged, corrected and relied upon, whereas a verbal statement vanishes as soon as the contact person changes. On a project spread over several months, this is often what separates a controlled site from one that is endured.

Upstream: audit, survey and costed scenarios

Everything starts with a visit. Actual heights, the condition of the walls, dust levels, obstacles, operating hours and the accessibility of light points shape the rest of the project. None of this can be deduced from a drawing.

Then comes the work on assumptions: maintenance factor, reflectance values, operating hours, access constraints for installation. Every assumption adopted is written down, which makes it possible to discuss it and, later, to check it.

The scenario comparison is the document that tips a decision. Two or three configurations are simulated and costed, each with its installed power, photometric result and associated budget. The client then decides on comparable elements rather than on intuition.

During the works: layout and on-site adjustment

The site always reveals differences between the drawing and the building: a beam that was not surveyed, a cable tray that has been moved, a rack raised since the last survey. Without a technical contact, these differences are handled by improvisation, luminaire by luminaire.

The design office settles these points with the photometric result as the reference. Moving a row of luminaires by one metre may have no effect or may degrade the uniformity of an entire aisle, and only the simulation can tell before drilling.

Adjustment also covers points that cannot be seen on a drawing: the exact aiming of a floodlight, the setting of a detector, the time delay of a zone, the split of control circuits. These settings are made with the operator present, during real hours of use, and are recorded so they can be revisited later.

Afterwards: acceptance measurements and deviations from the study

Acceptance is when the study proves its value. Lux meter readings, taken according to a written protocol, are compared with the calculated values. A deviation is not abnormal in itself, but it must be explained: walls darker than expected, furniture not modelled, luminaires not stabilised, daylight not properly excluded.

This check protects both parties. It allows the works to be closed out on facts and provides a useful document in the event of a later inspection or dispute.

The protocol matters as much as the values recorded. Grid of points, height of the measurement plane, stabilisation of the luminaires, exclusion of daylight: without these conditions written in advance, two successive surveys in the same room can differ widely and make it impossible to conclude acceptance.

A study disconnected from the product leads to specifications that cannot be met. A product chosen without a study leads to installations that comply on paper and are uncomfortable in use. The two skills go hand in hand.

Luminance Consulting has been advising on professional lighting solutions since 2013 and sells the solutions it recommends, working throughout France with references such as Airbus, Safran and Sanofi. The design office complements the audit, the choice of luminaires and field expertise. The ranges used cover both industrial luminaires and luminaires for commercial buildings. The about Luminance Consulting page describes this organisation.

What the study changes for the client

The study includes: site visit, measurements, DIALux evo simulation with false-colour rendering, and a costed report covering energy savings, maintenance costs, budget and financing. The client therefore has the technical documents before committing to the works.

This shifts the moment of decision. The discussion is about a simulated result and a documented budget, at a stage where the layout, the level or the product can still be changed at no extra cost.

The documents to ask for before signing

  1. The full simulation report, with its assumptions: maintenance factor, reflectance values, height of the calculation plane.
  2. The dimensioned layout plan, with furniture and obstacles shown.
  3. The result tables by zone: average illuminance, minimum, uniformity, glare.
  4. The photometric files of the proposed luminaires and their data sheets.
  5. The acceptance measurement protocol and the acceptance criteria adopted.

These documents are obtained before the order, never after. Their content is detailed in our article on the photometric study, and our lighting design office page sets out the scope of our work on a project.

Book a meeting and send us your plans and operating constraints: we will scope your project and send you a quote.

Further reading: Photometric study: what it is for and what it contains and Lighting audit: what we measure during a site visit. Reference: DIALux evo software (official site).

On the equipment side, at Rexylum: the LED floodlights range and the LED panels range.

Frequently asked questions

What does a lighting design office actually produce?
A lighting design office delivers verifiable documents, not intentions: site surveys, calculation assumptions, simulations, layout plans, result tables, costing and scenario comparison. These documents are used to decide internally, to consult contractors on a comparable basis, then to check at acceptance that the installation delivered matches what was approved.
What is a lighting design office for during the works?
The site always reveals differences between the drawing and the building, such as a beam that was not surveyed or a rack that has been raised. The design office settles these points with the photometric result as the reference, because moving a row of luminaires can degrade the uniformity of an entire aisle. It also handles on-site adjustment: floodlight aiming, detector settings, time delays.
Which documents should you ask a lighting design office for before signing?
Ask for the full simulation report with its assumptions, the dimensioned layout plan, the result tables by zone (average illuminance, minimum, uniformity, glare), the photometric files and data sheets of the proposed luminaires, and the acceptance measurement protocol with the acceptance criteria adopted. These documents are obtained before the order, never after.

Related articles

More articles, those in the same category first.

View all articles
  • Industrial production line under high-mounted LED lightingChoosing equipment and design office

    ATEX zones, heat, corrosion: choosing a luminaire that lasts

    ATEX zones, -60 to +120 °C, high-pressure washing, salt air: what breaks a luminaire, what IP and IK really guarantee, why to calculate first.

    Luminance ConsultingProfessional lighting design office

    8 min read

  • Industrial LED high bay seen from below, suspended under a factory roofChoosing equipment and design office

    UGR, CRI, uniformity: reading an LED luminaire data sheet

    UGR, CRI, uniformity, maintenance factor, L80, lm/W: what each indicator really measures and the pitfalls to spot on an LED data sheet.

    Luminance ConsultingProfessional lighting design office

    8 min read