At the start of the financial year, the question almost always comes up in the same terms: can we simply change the light sources rather than remove the luminaires? The relamping quote is noticeably lighter and needs no study. In many cases, it also shuts the door on real savings for the next ten years.
What relamping and full renovation actually cover
Relamping means replacing the light sources in the existing luminaires, keeping the housings, optics, supports and often the control gear. A full renovation removes everything and installs new luminaires, with a redefined layout and, where appropriate, a rework of the controls.
Between the two there are intermediate situations: partial removal, keeping the supports, replacing only the optical unit on certain families of luminaires. The choice is made zone by zone, never building by building.
The vocabulary should be fixed from the first meeting. Some suppliers call relamping an operation that includes removing the housings, others reserve the term for changing the source only. A tender launched on a poorly defined word produces offers that do not cover the same scope of works.
When the existing layout rules out simple relamping
The decisive point is the original layout. It was calculated for discharge or fluorescent sources, with different flux distributions and efficiencies. Changing the source in an unsuitable grid reproduces the defects of the installation and locks them in for a long time.
Three signs call for a complete rework:
- A grid inherited from a layout that no longer exists, with workstations moved since, partitions added or racks raised.
- Uniformity that was already insufficient before the works, visible as dips in illuminance between luminaires.
- An unsuitable mounting height or optic, producing hot spots under the luminaires and dark areas between them.
In all three cases, the new source improves consumption without correcting the geometry. The room remains uncomfortable and compliance remains out of reach.
Condition of luminaire housings, optics and supports
Relamping assumes the installed base is in good condition. Yellowed diffusers, oxidised reflectors, hardened gaskets and corroded fixings absorb part of the flux and raise a safety issue. In an ageing luminaire, a new source shines through a diffuser that has lost some of its transmission.
Sealing deserves particular attention in workshops and outdoors. An ingress protection rating stated originally is worthless if the gasket has aged or if the enclosure has been reopened several times. This point is checked luminaire by luminaire during the on-site lighting audit.
Electrical compatibility and warranties after modification
Replacing a source in an existing luminaire modifies that luminaire. Depending on the solution chosen, the ballast must be bypassed or removed, the internal wiring adapted and compatibility with the existing control system checked. Dimming designed for an earlier technology will not necessarily control an LED source.
Two consequences are regularly underestimated. The warranty of the original luminaire lapses as soon as its internal wiring is modified. And whoever modifies the luminaire takes on responsibility for the product thus transformed, with the marking and documentation obligations that go with it. These points are settled before the order, with the contractor who will carry out the works.
Effect on uniformity and on the compliance of the room
The compliance of a room is assessed on several criteria at once: maintained illuminance on the task area, uniformity, glare, colour rendering. Relamping acts mainly on the flux, marginally on the distribution, and not at all on the position of the light points.
Relamping can even degrade an acceptable situation. A more directional source placed in an optic designed for a diffuse source concentrates the flux in the centre and darkens the periphery. The average goes up, uniformity goes down, and complaints appear at the workstation.
The check is made on the task area, not on the room average. Relamping that raises the overall average while leaving an assembly station in a dip in illuminance solves nothing from a compliance point of view, and the acceptance measurement will show it.
Comparing the two scenarios over the operating life
An honest comparison is made over the operating life, not on the purchase price. Five criteria genuinely differentiate the two scenarios.
Criterion | Relamping | Full renovation |
|---|---|---|
Initial investment | Lower, limited supply and installation | Higher, removal and reinstallation included |
Room for photometric improvement | Limited to the existing grid | Layout redefined according to the task |
Control of compliance | Partial, the geometry stays fixed | Complete, criteria verified by simulation |
Warranty and liability | To be re-established after modification | Carried by the new luminaire |
Controls and detection | Depending on the compatibility of the existing system | Built in from the design stage |
The detailed calculation method is set out in our article on the real cost of LED lighting over ten years. The overall framing of a project is covered in where to start an industrial lighting renovation.
When partial relamping remains the right choice
Relamping remains entirely relevant in several concrete situations: a room whose layout was calculated recently and is still suitable, a building whose use is due to change in the short term, a secondary area with no task requirement, or cash flow that requires spreading the expenditure over several financial years.
In the latter case, the right approach is to fully renovate the areas with high requirements and long operating hours, then handle the rest by relamping, with LED lamps and tubes for the luminaires kept and linear battens for the areas reworked. The phasing is decided on the plan, with the operating hours of each zone alongside.
To decide zone by zone on your site, book a meeting: we will scope your project and send you a quote.